реклама

Keel laying ceremony of a fishery trawler will take place in plant Pella

0 30 1 мин
The Deputy Prime Minister of Russia Arkady Dvorkovich, the Deputy Minister of Agriculture – the head of Federal Agency for Fishery Ilya Shestakov, the deputy head of Rosrybolovstvo Pyotr Savchuk, the head of Northwest Territorial Department of Rosrybolovstvo Denis Belyaev will take part in the Ceremony.
The vessel was ordered by Murmansk company "Murmanseld-2". The freezing fish hold of 1400 CBM (temperature condition of -30 °C) and a hold of fish meal of 230 CBM (up to +18 °C) will be onboard, Rosrybolovstvo reports.

Productivity of the freezing equipment will be more than 100 tons of frozen production per day, filleting equipment – more than 20 tons of finished goods per day. Shark factory will be equipped with the machinery for sorting, beheading, imboweling and fish filleting and also for production of fodder forcemeat, liquid fish waste and fish meal.

Shipbuilding plant Pella specializes in production of modern multipurpose sea vessels. One of the relevant tasks facing today the Leningrad shipbuilding plant Pella – updating of Russian outdated technical and fishery fleet. 

On shipyard more than 8 sea vessels can be under construction at the same time annually, from 50 m to 100 m long, draft up to 6 m, including the Arctic class.

 



Комментарии   0.

Чтобы принять участие в обсуждении, пожалуйста Авторизуйтесь или Зарегистрируйтесь
Свежие новости
В РРПК рассказали об организации производства на супертраулерах
18:49 , 26 Апреля 2024 / рыболовство